Getting Started: first power-up and flashing flow
A practical first-run checklist from power wiring to the first validation step on V7RCDOM-V2.
Updated: 2026-04-03
Before powering up
- Check battery polarity and external switch wiring
- Use a USB Type-C cable that supports data transfer
- Avoid attaching too many external devices during the first test
Recommended first test flow
- Flash firmware and verify serial output.
- Test one GPIO or one PWM device first.
- Move into the full motor or chassis workflow after the basics pass.
Why staged validation matters
Breaking the process into smaller steps helps you identify whether a problem comes from power, wiring, flashing or application logic.