Getting Started: first power-up and flashing flow

A practical first-run checklist from power wiring to the first validation step on V7RCDOM-V2.

Updated: 2026-04-03

Before powering up

  • Check battery polarity and external switch wiring
  • Use a USB Type-C cable that supports data transfer
  • Avoid attaching too many external devices during the first test

Recommended first test flow

  1. Flash firmware and verify serial output.
  2. Test one GPIO or one PWM device first.
  3. Move into the full motor or chassis workflow after the basics pass.

Why staged validation matters

Breaking the process into smaller steps helps you identify whether a problem comes from power, wiring, flashing or application logic.